OGS BEl-Red Office Building

Goudy Construction Company hit the ground running on our first project. We began construction in January 1999 after 3 months of record rain fall. The sitework required an underground detention vault be built prior to construction of the building. Goudy worked closely with the architect to enhance the systems originally proposed for the building and deliver a project which exceeded to original design. Commercial Office Building •13,000 sf gross floor area

  • 2 story steel, masonry and wood structure
  • Cedar and masonry exterior
  • Raw steel stairs and railings
  • Vaulted entry paneling